It probably wouldn't be a weekend if I didn't ask a question

I'm wondering how worried I need to be about leveling the stand before putting the tank on it and filling it and if you have any suggestion on the best methods for something like this. I did notice if I put a 1/4 inch long shim under the back length of the stand, it raises it up and makes it perfectly level, but then I'm in a scenario where the two side panels do not touch the ground exactly. I could shim these but I'm not sure if I need complete contact or if shimming every few inches would work.
Any thoughts?